Product Description
Resistance Rocker Arm Portable point welder Cabinet Table Spot Welding Machine
1.When welding iron cabinets and operation table lamp parts, there are no welding pits on the surface of the parts to improve the appearance quality of the product.
2. For spot welding in the deep parts of the cabinet, traditional spot welding machines are difficult to achieve the welding points, while articulated spot welding machines are easy to achieve spot welding.
3. Using pneumatic pressure can reduce labor intensity, obtain a constant spot welding pressure, and make the welding points uniform and consistent.
4. Flexible and convenient operation makes it easier to significantly improve production efficiency in product design.
5. The workpiece does not require polishing, there is no secondary processing dust, and it can improve the working environment. It can be easily operated without special skills or experience.
6. The lower electrode is a horizontal workbench, and the workpiece can be directly placed on the workbench.
Main Specification:
Items \ Models |
DN(B)-100 |
DN(B)-160 |
DN(B)-200 |
DN(B)-250 |
Rated power (KVA) |
100 |
160 |
200 |
250 |
Power input(V) |
3φAC 380V |
3φAC 380V |
3φAC 380V |
3φAC 380V |
Max. short circuit current (KA) |
30 |
35 |
40 |
45 |
Duty cycle(%) |
50 |
50 |
50 |
50 |
Max. force(N) |
6000 |
6000 |
10000 |
15000 |
Electrode length( MM) |
450 |
450 |
450 |
500 |
Working stroke( MM) |
80 |
80 |
80 |
80 |
Cooling consumption(L/min) |
20 |
20 |
20 |
20 |
Max. welding capacity(MM) |
3.0+3.0 |
4.0+4.0 |
5.0+5.0 |
6.0+6.0 |
Detailed Photos
Any questions, welcome to consult
Company Profile
FAQ
1. Q: What is the power supply of the machine?
A: The standard power supply in china is AC380V, 3P-50/60Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.