Customization: | Available |
---|---|
Control: | Semi-Automatic |
Cooling Way: | Air Cooling |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.The machine structure is Stable.
2.For second current-carrying parts, the upper part is insulative. That is to avoid short-circuit accident, when iron attached or you put the welding part on the under base.
3.The adjustable speed of electrode reduce the shock to welded working parts when compressing the welded working parts, and reduce the noise.
4.Transformer has adopted the low impedance design. Second circuit using the high-quality conducting material. It can reduce the internal friction. The small input can acquire bigger welding current.
5.It can reserve 15 welding procedure, different welding condition can reserved in the different welding procedure. It can welding the different material accurately, conveniently and smoothly.
6.The second feedbackloop can make up the welding current sustainably. Twice discharge operating mode can improve the welding stability. The special material can be preheated or tempered.
7.Operation interface use digital or liquid crystal display (LCD). Clear, simple, intuitive.
8.It is widely used in the iron wire hardware, household appliances manufacture, metal pate processing and manufacturing, micro-electronics and other domain.
Parameters:
Rated Capacity: | 63KVA |
Input Voltage: | 380V |
Rated Frequency: | 50Hz |
Maximum Short Current: | 14000KA |
Duty Cycle: | 20% |
Max Pressure: | 3000N |
Cooling Water Flow: | 3L/min |
1. Q: What is the power supply of the machine?
A: The standard power supply in china is AC380V, 3P-50/60Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.